0

GEO5 software

Online nápověda

Stromeček
Nastavení
Program:
Jazyk:

Verification

Verification of pile (or group of piles) bearing capacity depends on the verification methodology selected in the "Pile CPT" tab:

In settlement calculation it is possible to use either a load-settlement curve or a load-displacement curve when adopting the NEN 6743 standard.

Vyzkoušejte si programy GEO5. Zdarma.